Owner:
-
Contract Value:
40,000,000 EGP
-
Project Date:
2019-01-08
-
Projects Period:
8 Months
Arab Academy- South Valley branch
South Valley branch “Third phase” at Arab Academy for Science ,Technology & Maritime Transport–South valley branch-Aswan
Project scope
“Electric Works”
NCTC Supply, install, Connect and test the following items:-
1-Main electrical panels (MDB)
2-Lighting Fixtures (60*60 ,120 cm IP 65 total lighting fixtures ,spots) quantity 1200 lighting
3-power , sockets outlets ,floor box , industrial sockets ,disconnect switches (normal and waterproof ) quantity 1200 outlets
4-MCC panel (For HVAC System).
5-Electrical panels (SMDB , Distribution panels) total panels 33
6-Data racks , patch panels and R&M R6 Cables
7-(main panel 8 loops, repeater, 460 devices)
8-Fire Alarm system Notifier brand
9-Sound system (Bose, Crown, sure brand)
Project scope
“Mechanical Works”
NCTC Supply, install, Connect and test the following items:-
1-Ducted Horizontal fan coil unit (F.C.U) complete with fans, chilled water cooling coil, filters, control valves, control devices, balance valves,3-way valve ,strainer, flexible connection, drain valve and air vent and digital thermoset.
2-F.C.U-01 capacity of 1.5 TR. 1000 cmh
3-F.C.U-02 capacity of 2 TR. 1400 cmh
4-F.C.U-03 capacity of 2.5 TR. 1800 cmh
5-F.C.U-04 capacity of 3 TR. 2100 cmh
6-F.C.U-05 capacity of 3.5 TR. 2500 cmh
7-chilled water piping network Black seamless steel schedule 40 c/w gate valves, globe valves, balance valves, air separator units, fittings, hangers, flexible connection.